Changes

Jump to navigation Jump to search
Line 40: Line 40:     
==Life Cycle Costs==
 
==Life Cycle Costs==
Below are capital and life cycle cost estimates for an [[Rainwater harvesting|Underground Rainwater Cistern]], Non-Infiltrating configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 46% of total life cycle costs over the 25-year evaluation period, and increase to 60% of total life cycle costs over the 50-year period, due to increased levels of litter removal, vaccuum cleaning of the associated catchbasin, watering during the first and 2nd years (establishment period), annual watering, drought watering, mowing and aerating the grass, weeding and pruning and replacing any wilting/dying sections with new sod.
+
Below are capital and life cycle cost estimates for the [[Vegetated filter strip]] design configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 46% of total life cycle costs over the 25-year evaluation period, and increase to 60% of total life cycle costs over the 50-year period, due to filter strip surface rehabilitation costs assumed to be required after 25 years of operation.
    
===25-Year life cycle cost break down===
 
===25-Year life cycle cost break down===

Navigation menu