All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: large stone and riprap (content was: "Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope. '''Construction Steps:''' #Backfill the material from the outside of the LID facility to avoid compaction. #Ensure the material is being placed to the elevation and thickn...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: curbing (content was: "thumb|350px|right|Improper elevation at the curb cut, impeding the inflow to enter the LID facility (bioretention) (Photo source: CVC, 2015) It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they...", and the only contributor was "SamanthaPelayo" (talk))
- 15:39, 21 November 2022 Dean Young talk contribs deleted page File:CIprocessFig63new.png
- 15:01, 21 November 2022 Dean Young talk contribs created page File:CIprocessFig63new.png (Recommended construction and assumption inspection process)
- 15:01, 21 November 2022 Dean Young talk contribs uploaded File:CIprocessFig63new.png (Recommended construction and assumption inspection process)
- 14:59, 21 November 2022 Dean Young talk contribs deleted page File:CI process Fig6.3 updated 20220830.png
- 14:49, 21 November 2022 Dean Young talk contribs created page File:CI process Fig6.3 updated 20220830.png (Recommended process for conducting construction and assumption inspections.)
- 14:49, 21 November 2022 Dean Young talk contribs uploaded File:CI process Fig6.3 updated 20220830.png (Recommended process for conducting construction and assumption inspections.)
- 20:58, 18 November 2022 DanielFilippi talk contribs created page File:OGS Review Sheet LOCKED UPDATE.xlsx
- 20:58, 18 November 2022 DanielFilippi talk contribs uploaded File:OGS Review Sheet LOCKED UPDATE.xlsx
- 22:51, 1 November 2022 174.114.241.27 talk submitted feedback post #0610d59... on Permeable pavements
- 15:36, 1 November 2022 DanielFilippi talk contribs restored page Placement and finishing (3 revisions)
- 15:35, 1 November 2022 DanielFilippi talk contribs deleted page Placement and finishing (content was: "375px|thumb|right|Vibratory screed flattening porous concrete. ([https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf CVC, 2012])<ref>CVC. 2012. Low Impact Development Construction Guide. Version 1.0. https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf</ref> File:Vibratory-s...", and the only contributor was "SamanthaPelayo" (talk))
- 14:28, 28 October 2022 192.186.125.158 talk submitted feedback post #06107bf... on Enhanced swales
- 14:41, 17 October 2022 DanielFilippi talk contribs created page Inspection and maintenance (Redirected page to Inspections and maintenance) Tag: New redirect
- 17:33, 14 October 2022 SamanthaPelayo talk contribs created page File:Double-ring-infiltrometer.png
- 17:33, 14 October 2022 SamanthaPelayo talk contribs uploaded File:Double-ring-infiltrometer.png
- 17:33, 14 October 2022 SamanthaPelayo talk contribs created page File:Flood-test-permeable-pavers.jpg
- 17:33, 14 October 2022 SamanthaPelayo talk contribs uploaded File:Flood-test-permeable-pavers.jpg
- 17:33, 14 October 2022 SamanthaPelayo talk contribs created page File:Flood-test-bioretention.jpg