- 19:45, 24 November 2022 diff hist +426 Stormwater planters
- 19:04, 24 November 2022 diff hist +10 Permeable pavements →Construction
- 19:00, 24 November 2022 diff hist -24 Permeable pavements →Construction
- 19:00, 24 November 2022 diff hist +6 Permeable pavements →Construction
- 18:59, 24 November 2022 diff hist +37 Permeable pavements →Construction
- 18:58, 24 November 2022 diff hist +300 Infiltration chambers →Construction
- 18:54, 24 November 2022 diff hist +13 Bioretention →Construction
- 18:53, 24 November 2022 diff hist +177 Bioretention →Construction
- 15:38, 22 November 2022 diff hist +169 Bioretention →Construction
- 15:33, 22 November 2022 diff hist +22 Permeable pavements →Construction
- 15:32, 22 November 2022 diff hist 0 Permeable pavements →Construction
- 15:27, 22 November 2022 diff hist +1 Permeable pavements →Construction
- 15:27, 22 November 2022 diff hist -1 Permeable pavements →Construction
- 15:27, 22 November 2022 diff hist -22 Permeable pavements →Construction
- 15:26, 22 November 2022 diff hist +7 Permeable pavements →Construction
- 15:24, 22 November 2022 diff hist +1 Permeable pavements →Construction
- 15:23, 22 November 2022 diff hist -16 Permeable pavements →Construction
- 15:21, 22 November 2022 diff hist +333 Permeable pavements →Construction Considerations
- 19:23, 28 October 2022 diff hist 0 Finishing grades and surface layer installation: vegetated LIDs →Soil media and amendments
- 19:23, 28 October 2022 diff hist +131 Finishing grades and surface layer installation: vegetated LIDs →Soil media and amendments
- 19:20, 28 October 2022 diff hist -1 Finishing grades and surface layer installation: permeable pavements →Placement and finishing
- 19:20, 28 October 2022 diff hist +31 Finishing grades and surface layer installation: permeable pavements →Placement and finishing
- 19:15, 28 October 2022 diff hist +108 Post-construction →Final certification current
- 19:12, 28 October 2022 diff hist +4 Final Certification
- 19:12, 28 October 2022 diff hist +4,113 Post-construction →Final certification
- 19:09, 28 October 2022 diff hist +9,354 Finishing grades and surface layer installation: permeable pavements
- 19:06, 28 October 2022 diff hist 0 Finishing grades and surface layer installation: permeable pavements →Stabilizing contributing drainage area
- 19:06, 28 October 2022 diff hist +4 Finishing grades and surface layer installation: permeable pavements →Stabilizing contributing drainage area
- 19:04, 28 October 2022 diff hist +2,371 Finishing grades and surface layer installation: permeable pavements →Curbing
- 19:03, 28 October 2022 diff hist +557 Finishing grades and surface layer installation: permeable pavements →Stabilizing contributing drainage area
- 19:00, 28 October 2022 diff hist +15 Finishing grades and surface layer installation: permeable pavements →Joint aggregate
- 18:59, 28 October 2022 diff hist +1,975 Finishing grades and surface layer installation: permeable pavements →Joint aggregate
- 18:59, 28 October 2022 diff hist +3 Joint aggregate current
- 18:57, 28 October 2022 diff hist +157 Finishing grades and surface layer installation: permeable pavements →Placement and finishing
- 18:51, 28 October 2022 diff hist +4,580 Finishing grades and surface layer installation: permeable pavements →Placement and finishing
- 18:51, 28 October 2022 diff hist +21 Placement and finishing current
- 18:51, 28 October 2022 diff hist -3 Finishing grades and surface layer installation: permeable pavements →Placement and installation
- 16:45, 28 October 2022 diff hist 0 Finishing grades and surface layer installation: permeable pavements
- 16:44, 28 October 2022 diff hist +1 Finishing grades and surface layer installation: vegetated LIDs →Stabilizing contributing drainage area - planting adjacent vegetation
- 16:44, 28 October 2022 diff hist +48 Finishing grades and surface layer installation: vegetated LIDs →Stabilizing contributing drainage area - planting adjacent vegetation
- 16:43, 28 October 2022 diff hist +1,476 Finishing grades and surface layer installation: vegetated LIDs
- 16:41, 28 October 2022 diff hist +2,574 Finishing grades and surface layer installation: vegetated LIDs →Plant material verification and installation
- 16:40, 28 October 2022 diff hist +862 Finishing grades and surface layer installation: vegetated LIDs →Large stone and riprap
- 16:38, 28 October 2022 diff hist +145 Sub-surface components →Pretreatment and inlet current
- 16:30, 28 October 2022 diff hist +1 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 16:30, 28 October 2022 diff hist -6 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 16:29, 28 October 2022 diff hist +21 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 16:29, 28 October 2022 diff hist +34 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 16:27, 28 October 2022 diff hist -345 Sub-surface components
- 16:05, 28 October 2022 diff hist -15 Sub-surface components
- 16:04, 28 October 2022 diff hist +377 Sub-surface components
- 16:02, 28 October 2022 diff hist +6,448 Sub-surface components
- 16:01, 28 October 2022 diff hist +7,592 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 15:59, 28 October 2022 diff hist +2,753 Sub-surface components →Permeable pavement sub-base and base course
- 15:58, 28 October 2022 diff hist +1,598 Sub-surface components →Storage reservoir
- 15:58, 28 October 2022 diff hist +1,089 Sub-surface components →Monitoring wells
- 15:54, 28 October 2022 diff hist +1,425 Sub-surface components →Overflows
- 15:54, 28 October 2022 diff hist +1,939 Sub-surface components →Impermeable liners
- 15:53, 28 October 2022 diff hist +2,126 Sub-surface components →Underdrains
- 15:53, 28 October 2022 diff hist +2,780 Sub-surface components →Geotextiles
- 15:51, 28 October 2022 diff hist 0 Pre-construction →Erosion and sediment control inspection and maintenance
- 15:51, 28 October 2022 diff hist 0 Pre-construction →Erosion and sediment control inspection and maintenance
- 11:36, 17 October 2022 diff hist -132 Sub-surface components
- 11:35, 17 October 2022 diff hist +57 Sub-surface components
- 17:33, 14 October 2022 diff hist 0 N File:Double-ring-infiltrometer.png current
- 17:33, 14 October 2022 diff hist 0 N File:Flood-test-permeable-pavers.jpg current
- 17:33, 14 October 2022 diff hist 0 N File:Flood-test-bioretention.jpg current
- 17:32, 14 October 2022 diff hist +4,133 N Final Certification Created page with "Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and that mitigation can occur before the contractor is relieved of responsi..."
- 17:32, 14 October 2022 diff hist +192 Post-construction →Addressing deficiencies
- 17:31, 14 October 2022 diff hist 0 Finishing grades and surface layer installation: vegetated LIDs →Stabilizing contributing drainage area - planting adjacent vegetation
- 17:31, 14 October 2022 diff hist 0 Template:Construction: stabilizing contributing drainage area current
- 17:28, 14 October 2022 diff hist +666 N Template:Construction: stabilizing contributing drainage area Created page with " Similar to the plant material verification and installation task shown in Construction: plant material verification and installation page, any planting required to stabil..."
- 17:28, 14 October 2022 diff hist 0 Joint aggregate
- 17:27, 14 October 2022 diff hist 0 N File:P1120709.jpg current
- 17:27, 14 October 2022 diff hist 0 N File:P1150948.jpg current
- 17:27, 14 October 2022 diff hist +1,992 N Joint aggregate Created page with "The joint aggregate is an important component of Permeable Interlocking Concrete Pavement (PICP) installations, as it allows for water falling on the surface to infiltrate int..."
- 17:26, 14 October 2022 diff hist 0 N File:JointCutting2.jpg current
- 17:26, 14 October 2022 diff hist +1,282 N Joint cutting Created page with "File:JointCutting2.jpg|400px|thumb|right| Cutting joints with a "pizza cutter". (Concrete Network, 2022)<ref> Concrete Network. 2022. Permeable Concrete Pavements. Photo. Ac..." current
- 17:25, 14 October 2022 diff hist 0 N File:IMG 3313.jpg current
- 17:25, 14 October 2022 diff hist 0 N File:Tamping.jpg current
- 17:23, 14 October 2022 diff hist 0 N File:Paver-placement-vehicle.jpg current
- 17:23, 14 October 2022 diff hist 0 N File:Paver-placement-vehicle-2.jpg current
- 17:23, 14 October 2022 diff hist 0 N File:Paver-placement-crane.jpg current
- 17:23, 14 October 2022 diff hist 0 N File:Paver-placement-cut.jpg current
- 17:23, 14 October 2022 diff hist 0 N File:IMAX-Paved.jpg current
- 17:22, 14 October 2022 diff hist 0 N File:Paver-cutting-incorrect.jpg current
- 17:21, 14 October 2022 diff hist 0 Placement and finishing
- 17:20, 14 October 2022 diff hist 0 N File:Concrete-roller.jpg current
- 17:20, 14 October 2022 diff hist 0 N File:Vibratory-screed-2.jpg current
- 17:20, 14 October 2022 diff hist 0 N File:Vibratory-screed.png current
- 17:19, 14 October 2022 diff hist +4,587 N Placement and finishing Created page with "File:Vibratory-screed.PNG|375px|thumb|right|Vibratory screed flattening porous concrete. ([https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf CVC,..."
- 17:18, 14 October 2022 diff hist 0 Bedding layer current
- 17:18, 14 October 2022 diff hist 0 N File:Bedding-raking.jpg current
- 17:18, 14 October 2022 diff hist +2,306 N Bedding layer Created page with "450px|thumb|right|Bedding course being spread across the infiltration area. (Photo Source: CVC, 2012) The bedding layer consists of a coarse stone..."
- 17:18, 14 October 2022 diff hist 0 N File:P1000154.jpg current
- 17:14, 14 October 2022 diff hist +1,497 N As-built surveys Created page with "Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion o..." current
- 17:14, 14 October 2022 diff hist 0 N File:Permanent-fencing.jpg current
- 17:13, 14 October 2022 diff hist 0 N File:IMG 0852-1.jpg current
- 17:13, 14 October 2022 diff hist -60 Finishing grades and surface layer installation: vegetated LIDs →Mulch placement
- 17:12, 14 October 2022 diff hist 0 N File:Spot8 p2 20190820.jpg current