Changes

Jump to navigation Jump to search
Line 12: Line 12:  
* Total daily water use of 2,000 L per day (tool default).
 
* Total daily water use of 2,000 L per day (tool default).
 
* User specified storage tank capacity of 50,000 L.
 
* User specified storage tank capacity of 50,000 L.
* Two (2) German-style in-line filters and precast concrete containment structures are included to provide pretreatment of roof runoff.
   
* Operation and maintenance (O&M) cost estimates assume annual inspections and cistern pump tests, removal of trash and debris from rooftop and pretreatment filter four times a year, and cleaning of cistern and replacement of pump and pressure tank every five years. Verification inspections are included every 5 years to confirm adequate maintenance.
 
* Operation and maintenance (O&M) cost estimates assume annual inspections and cistern pump tests, removal of trash and debris from rooftop and pretreatment filter four times a year, and cleaning of cistern and replacement of pump and pressure tank every five years. Verification inspections are included every 5 years to confirm adequate maintenance.
    
===Notes===
 
===Notes===
*
+
* Two (2) German-style in-line filters and precast concrete containment structures are included to provide pretreatment of roof runoff.
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.