<p>Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
+
Infiltration of stormwater into underlying native subgrade soils is one mechanism to achieving MECP [[runoff volume control targets]]. In many areas of Ontario, where municipal and private drinking water supplies are drawn from aquifers, it's also an important mechanism for groundwater recharge.
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
+
{{textbox|Drainage via infiltration be achieved through a number of LID BMP types:
 
*[[Infiltration chambers]] (underground)
 
*[[Infiltration chambers]] (underground)
 
*[[Infiltration trenches]] (underground)
 
*[[Infiltration trenches]] (underground)
*[[Dry ponds]] (surface)
+
*[[Exfiltration trenches| Exfiltration systems]] (underground)
*[[Bioretention cells]] (surface)
+
*[[Bioretention]] (surface, full- or partial-infiltration design variations)
*[[Bioswales]] (surface)
+
*[[Bioswales]] (surface, full- or partial-infiltration design variations)
 +
*[[Permeable pavements| Permeable pavements]] (surface, full- or partial-infiltration design variations)
 +
*[[Stormwater Tree Trenches|Stormwater tree trenches]] (surface, partial-infiltration design variation)
 +
*[[Enhanced swales]] or [[Swales |swales]] featuring check dams (surface)
 +
*[[Dry ponds]] or infiltration basins (surface)
 
}}
 
}}
</p>
+
 
===Constraints===
+
==Constraints==
 
Infiltration practices are not recommended:
 
Infiltration practices are not recommended:
<ol>
+
#over-swelling clays or unstable subsoils,
<li>Where the bedrock is within 1 m below the bottom of the proposed BMP,</li>
+
#contaminated soils or sites with high risk of contamination from on-site activities (i.e. pollution hot spots),
<li>Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP,<br>Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property,</li>
+
#in areas of known or implied [[Karst |karst topography]],
<li>Over swelling clays or unstable sub-soils,</li>
+
#on unstable or steep slopes (>15%),
<li>Over contaminated soils or sites with high risk of contamination from onsite activities, </li>
+
# to treat construction site runoff,
<li>In flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective,</li>
+
#to treat combined sewer overflows, 
<li>In areas where the ecology and natural hydrology are dependent upon surface water,</li>
+
#in flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups,
<li>Where prohibitions and/or restrictions exist per approved Source Protection Plans (see MOECC guidance).  
+
#in areas where the ecology and natural hydrology are dependent upon surface water,
</ol>
+
#in areas where increased infiltration will result in elevated groundwater levels that will damage critical utilities or private property, or
<p>
+
#where prohibitions and/or restrictions exist per approved source water protection plans (e.g. should not be used to treat pavement runoff within wellhead protection area B, 2 year time of travel zones, nor within groundwater quality issue contributing areas where Sodium or Chloride is a threat).
===Designing within constraints===
+
<br>
Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
+
See [[Site considerations]] for further guidance on potential site constraints and LID facility type selection and design considerations.
<ul>
  −
<li>[[Bioretention: Internal water storage |Bioretention with internal water storage]]</li>
  −
<li>[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]</li>
  −
</ul>
  −
Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
  −
<ul>
  −
<li>[[Bioretention: Non-infiltrating | Bioretention planters]]</li>
  −
<li>[[Rainwater harvesting]]</li>
  −
<li>[[Green roofs]]</li>
  −
</ul></p>
     −
===Planning===
+
===Designing with constraints===
<h4>Soil infiltration rate</h4>
+
{{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr:
<p>[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design. </p>
+
*See [[Underdrains| underdrains]] and  
<table>
+
*Results from STEP studies of infiltration facilities located on [[low permeability soils]] in Ontario.
    <table class="table-responsive table table-striped">
+
Infiltration facilities should be designed with modifications where:
        <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
+
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
        <tr class="success">
+
#the seasonal high groundwater level (i.e. water table) comes within 1 m below the bottom of the proposed BMP.
            <th rowspan="2"  class="text-center">Catchment area</th>
+
}}
            <th colspan="3" class="text-center">Consequence of failure</th>
+
{{:Groundwater}}
            <tr class="success">
+
----
                <th  class="text-center">No damage or inconvenience</th>
  −
                <th  class="text-center">Minor damage or inconvenience to external structures (e.g. ponding in parking lot)</th>
  −
                <th  class="text-center">Significant damage to buildings or infrastructure (e.g. flooding damage)</th>
  −
            </tr>
  −
            <tr>
  −
                <td  class="text-center"><100 m<sup>2</sup></td>
  −
                <td  class="text-center">1.5</td>
  −
                <td  class="text-center">2</td>
  −
                <td  class="text-center">10</td>
  −
            </tr>
  −
            <tr>
  −
                <td style="white-space: nowrap"  class="text-center"> 100 - 1000 m<sup>2</sup>
  −
                    <td  class="text-center">1.5</td>
  −
                    <td  class="text-center">3</td>
  −
                    <td  class="text-center">10</td>
  −
            </tr>
  −
    </table>
  −
<h4>Groundwater</h4>
  −
<p> The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year. </p>
  −
 
  −