<p>Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
+
Infiltration of stormwater into underlying native subgrade soils is one mechanism to achieving MECP [[runoff volume control targets]]. In many areas of Ontario, where municipal and private drinking water supplies are drawn from aquifers, it's also an important mechanism for groundwater recharge.
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
+
{{textbox|Drainage via infiltration be achieved through a number of LID BMP types:
*[[Infiltration chambers and trenches]] (underground)
+
*[[Infiltration chambers]] (underground)
*[[Infiltration basins]] (surface)
+
*[[Infiltration trenches]] (underground)
*[[Bioretention cells]] (surface)
+
*[[Exfiltration trenches| Exfiltration systems]] (underground)
*[[Bioswales]] (surface)
+
*[[Bioretention]] (surface, full- or partial-infiltration design variations)
 +
*[[Bioswales]] (surface, full- or partial-infiltration design variations)
 +
*[[Permeable pavements| Permeable pavements]] (surface, full- or partial-infiltration design variations)
 +
*[[Stormwater Tree Trenches|Stormwater tree trenches]] (surface, partial-infiltration design variation)
 +
*[[Enhanced swales]] or [[Swales |swales]] featuring check dams (surface)
 +
*[[Dry ponds]] or infiltration basins (surface)
 
}}
 
}}
</p>
  −
===Potential Constraints===
  −
<ol>
  −
<li>Shallow bedrock </li>
  −
<li>High groundwater or areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property. </li>
  −
<li>Swelling clays or unstable sub-soils</li>
  −
<li>Contaminated soils or sites with high risk of contamination from onsite activities </li>
  −
<li> Flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective. </li>
  −
<li> Areas where the ecology and natural hydrology are dependent upon surface water. </li>
  −
<li> Prohibitions and/or restriction per approved Source Protection Plans (see MOECC guidance).
  −
</ol>
     −
===Planning===
+
==Constraints==
<h4>Soil Infiltration Testing </h4>
+
Infiltration practices are not recommended:
<p>Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design. </p>
+
#over-swelling clays or unstable subsoils,
<h4>Groundwater</h4>
+
#contaminated soils or sites with high risk of contamination from on-site activities (i.e. pollution hot spots),
<p> The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year. </p>
+
#in areas of known or implied [[Karst |karst topography]],
 +
#on unstable or steep slopes (>15%),
 +
# to treat construction site runoff,
 +
#to treat combined sewer overflows, 
 +
#in flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups,
 +
#in areas where the ecology and natural hydrology are dependent upon surface water,
 +
#in areas where increased infiltration will result in elevated groundwater levels that will damage critical utilities or private property, or
 +
#where prohibitions and/or restrictions exist per approved source water protection plans (e.g. should not be used to treat pavement runoff within wellhead protection area B, 2 year time of travel zones, nor within groundwater quality issue contributing areas where Sodium or Chloride is a threat).
 +
<br>
 +
See [[Site considerations]] for further guidance on potential site constraints and LID facility type selection and design considerations.
   −
 
+
===Designing with constraints===
<div class="column clearfix">
+
{{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr:
<table class="table table-bordered table-hover" >
+
*See [[Underdrains| underdrains]] and
<tr class="success">
+
*Results from STEP studies of infiltration facilities located on [[low permeability soils]] in Ontario.
<th rowspan="2">Catchment area</th><th colspan="3">Consequence of failure</th>
+
Infiltration facilities should be designed with modifications where:
<tr class="success">
+
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
<th>No damage or inconvenience</th><th>Minor damage or inconvenience to external structures (e.g. ponding in parking lot)</th><th>Significant damage to buildings or infrastructure (e.g. flooding damage)</th>
+
#the seasonal high groundwater level (i.e. water table) comes within 1 m below the bottom of the proposed BMP.
<tr><td> <100 m<sup>2</sup></td><td>1.5</td><td>2</td><td>10</td></tr>
+
}}
<tr><td style="white-space: nowrap"> 100 - 1000 m<sup>2</sup><td>1.5</td><td>3</td><td>10</td></tr>
+
{{:Groundwater}}
</table>
+
----
 +
[[category:Infiltration]]