Line 11: Line 11:  
==Constraints==
 
==Constraints==
 
Infiltration practices are not recommended:
 
Infiltration practices are not recommended:
#over swelling clays or unstable sub-soils,
+
#over-swelling clays or unstable sub-soils,
#over contaminated soils or sites with high risk of contamination from onsite activities,  
+
#contaminated soils or sites with high risk of contamination from onsite activities,  
 
#in flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective,
 
#in flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective,
 
#in areas where the ecology and natural hydrology are dependent upon surface water,
 
#in areas where the ecology and natural hydrology are dependent upon surface water,
Line 23: Line 23:  
===Designing with constraints===
 
===Designing with constraints===
 
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
 
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
*See [[Underdrains]] for [[Bioretention]] and [[tree pits]], and  
+
*See [[Underdrains]] for [[Bioretention]] and [[trees|tree pits]], and  
 
*Results from STEP studies over [[low permeability soils]]
 
*Results from STEP studies over [[low permeability soils]]
 
}}
 
}}
Line 44: Line 44:  
----
 
----
 
==See also==
 
==See also==
[[Groundwater]]
+
*[[Groundwater]]
 +
 
 
[[category:Infiltration]]
 
[[category:Infiltration]]