Changes

Jump to navigation Jump to search
m
Line 1: Line 1: −
__NOTOC__
+
[[File:Gravel_diagram.jpg|thumb| 75 mm drop from the impervious surface onto the gravel diaphragm]]
 
[[File:Gravel diaphragm.png|thumb|Note the fall from the impervious surface to the gravel surface]]
 
[[File:Gravel diaphragm.png|thumb|Note the fall from the impervious surface to the gravel surface]]
   Line 21: Line 21:  
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,  
 
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,  
 
*The trench should be lined with geotextile before filling with gravel,   
 
*The trench should be lined with geotextile before filling with gravel,   
*River rock or decorative aggregate may be included in a layer at the top of the gravel fill, for aesthetic value.  
+
*River rock or decorative [[stone]] may be included in a layer at the top of the gravel fill, for aesthetic value.
    
==Materials==
 
==Materials==
 
===Gravel===
 
===Gravel===
The type of medium sized aggregates recommended for gravel diaphragms are described in [[choker layer]]. In some contexts it may be desirable to apply a surface layer of more decorative aggregate, see [[stone]].
+
The type of medium sized aggregates recommended for gravel diaphragms are described in [[choker layer]]. In some contexts it may be desirable to apply a surface layer of more decorative [[stone]].
   −
===[[Geotextiles]]===
+
===Geotextiles===
 
{{:Geotextiles}}
 
{{:Geotextiles}}
  
8,255

edits

Navigation menu