Changes

Jump to navigation Jump to search
Line 31: Line 31:  
*Minimum length 30 m
 
*Minimum length 30 m
   −
{|class="wikitable"
+
 
|+ Slope variations
+
 
|-
+
 
|< 2 %||Use underdrain to distribute water for infiltration
+
===Adding check dams===
|-
+
To calculate the spaing and sizing of check dams, see [[Check dams: Sizing]]
|2 - 5 %||Design swale for surface flow, consider check dams
+
 
|-
+
 
||5 %||Check dams required to reduce effective slope to 2 – 3 %
+
 
|}
      
Maximum depth of flow
 
Maximum depth of flow
8,255

edits

Navigation menu