Difference between revisions of "Bioretention cells: Gallery"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
 
Line 2: Line 2:
 
IMG 2457 750X500.jpg| Parking lot bioretention with surface ponding [[well]] in foreground, Kortright Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf technical brief].
 
IMG 2457 750X500.jpg| Parking lot bioretention with surface ponding [[well]] in foreground, Kortright Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf technical brief].
 
Edwards Gardens Bio 2014.JPG| Parking lot bioretention sharing underground reservoir with adjacent permeable paving, Edwards Gardens, Toronto, ON. Read a case study about it [https://sustainabletechnologies.ca/app/uploads/2016/08/Edwards-Gardens.pdf here.]
 
Edwards Gardens Bio 2014.JPG| Parking lot bioretention sharing underground reservoir with adjacent permeable paving, Edwards Gardens, Toronto, ON. Read a case study about it [https://sustainabletechnologies.ca/app/uploads/2016/08/Edwards-Gardens.pdf here.]
ER Bioretention.jpg| Parking lot bioretention with decorative [[stone]] for erosion control, and perforated pipe access standpipe in foreground, Earth Rangers Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2014/09/STEP-Bioretention-Report_2014.pdf technical report].
+
ER Bioretention.jpg| Parking lot bioretention with decorative [[stone]] for erosion control, and perforated pipe access standpipe in foreground, Earth Rangers Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2015/01/ER-Bio-Tech-Brief-Final.pdf technical brief].
 
7sigma RainGarden64.JPG|The sunken curb holds the edge of the asphalt pavement and lets water freely flow to the [[bioretention cell]] beside the 7sigma parking lot in Minneapolis, MN (USA)<br>Photo credit:[[Acknowledgements|Brian Ash]]
 
7sigma RainGarden64.JPG|The sunken curb holds the edge of the asphalt pavement and lets water freely flow to the [[bioretention cell]] beside the 7sigma parking lot in Minneapolis, MN (USA)<br>Photo credit:[[Acknowledgements|Brian Ash]]
 
File:Mississauga Elm Dr bioswale_001.jpg| Bioretention cells on Elm Drive, Mississauga, ON, with vertical sides and hardscape perimeter receive road runoff via leader pipes from road catch basin [[inlet |inlets]]. Read about the stormwater system at this site in the [https://cvc.ca/wp-content/uploads//2021/07/TechReport_Elm_Drive_Final.pdf performance assessment report].
 
File:Mississauga Elm Dr bioswale_001.jpg| Bioretention cells on Elm Drive, Mississauga, ON, with vertical sides and hardscape perimeter receive road runoff via leader pipes from road catch basin [[inlet |inlets]]. Read about the stormwater system at this site in the [https://cvc.ca/wp-content/uploads//2021/07/TechReport_Elm_Drive_Final.pdf performance assessment report].

Latest revision as of 16:01, 6 April 2022