The material pasted here has been retained for archival purposes only.

Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design.

Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities
Catchment area Consequence of failure
No damage or inconvenience Minor damage or inconvenience to external structures (e.g. ponding in parking lot) Significant damage to buildings or infrastructure (e.g. flooding damage)
<100 m2 1.5 2 10
100 - 1000 m2 1.5 3 10