Line 45:
Line 45:
{{:Turf}}
{{:Turf}}
{{:Stone}}
{{:Stone}}
−
===Check dams===
−
{{:Check dams}}
==Planting Design Considerations==
==Planting Design Considerations==
Line 58:
Line 56:
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.
*The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
*The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
+
+
===Check dams===
+
{{:Check dams}}