Changes

Jump to navigation Jump to search
m
no edit summary
Line 32: Line 32:  
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated [[pipe]] within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe.  
 
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated [[pipe]] within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe.  
 
|}
 
|}
[[category: modelling]]
+
[[category: modeling]]
8,255

edits

Navigation menu