Changes

Jump to navigation Jump to search
m
Line 37: Line 37:  
*''S<sub>i</sub>'': Initial existing slope ratio of the swale (rise/run)
 
*''S<sub>i</sub>'': Initial existing slope ratio of the swale (rise/run)
 
*''S<sub>e</sub>'': Desired effective slope of the enhanced swale (between 0.005 - 0.01, rise/run)
 
*''S<sub>e</sub>'': Desired effective slope of the enhanced swale (between 0.005 - 0.01, rise/run)
*''h'': The average effective height of the check dams in m (excluding foundations)}} (suggest you use ''y'', calculated above)
+
*''h'': The average effective height of the check dams in m (excluding foundations)(suggest you use ''y'', calculated above)}}
 
----
 
----
 
*The first check dam should be constructed on a stable point in the gully such as a rock outcrop, the junction point of the gully to a road, the main stream or river, lake or reservoir.  
 
*The first check dam should be constructed on a stable point in the gully such as a rock outcrop, the junction point of the gully to a road, the main stream or river, lake or reservoir.  
8,255

edits

Navigation menu