Line 10:
Line 10:
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
+
+
'''11 June 2018'''
+
''The term "forebay" has a strong industry connection to SWM ponds, should this page have a different/more specific name?''
+
*"Forebay" now redirects to the newly named [[Pretreatment features]] page as you suggest.
'''24 April 2018'''
'''24 April 2018'''