| *Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols; | | *Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols; |
| *An operations and maintenance manual is to be provided that includes a maintenance schedule; | | *An operations and maintenance manual is to be provided that includes a maintenance schedule; |
− | ===Quantity Control Section=== | + | ===Quantity control=== |
| *Runoff coefficient or imperviousness calculations; | | *Runoff coefficient or imperviousness calculations; |
| *Analysis using appropriate storm distributions; | | *Analysis using appropriate storm distributions; |
Line 59: |
Line 59: |
| *Overland flow conveyance and design; | | *Overland flow conveyance and design; |
| *External drainage conveyance (100 year and Regional); | | *External drainage conveyance (100 year and Regional); |
− | 2.2. Quality Control Section
| + | ===Quality control=== |
− | • Level of Protection.
| + | *Level of Protection; |
− | • Drainage Area to Facility in hectares.
| + | *Drainage Area to Facility in hectares; |
− | • Percentage Impervious – total and directly connected areas.
| + | *Percentage Impervious – total and directly connected areas; |
− | • SWM Facility Monitoring and Maintenance Requirements.
| + | *SWM Facility Monitoring and Maintenance Requirements; |
− | 3. Hazard Land Management
| + | ==Hazard land management== |
− | • Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings.
| + | *Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings; |
− | • Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only).
| + | *Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only); |
− | • Wetlands and required setbacks determined and identified on plans.
| + | *Wetlands and required setbacks determined and identified on plans; |
− | • Meanderbelt assessment and/or setback determined and identified on plans.
| + | *Meanderbelt assessment and/or setback determined and identified on plans; |
− | • Wave uprush and/or wind setup elevations calculated (Lake Simcoe Shoreline).
| + | *Wave uprush and/or wind setup elevations calculated; |
− | • “Limit of development” shown on plans.
| + | *“Limit of development” shown on plans; |
− | • Survey and floodplain mapping submitted (As per minimum requirement in Appendix K).
| + | *Survey and floodplain mapping submitted (see below); |
− | • Hydraulic modelling and analysis including digital files (As per minimum requirements identified in Appendices C, I and K).
| + | *Hydraulic modelling and analysis including digital files; |
− | 4. Other
| + | ==Other== |
− | Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format.
| + | *Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format; |
| ---- | | ---- |
| ===Floodplain mapping and documentation minimum requirements=== | | ===Floodplain mapping and documentation minimum requirements=== |