Changes

Jump to navigation Jump to search
m
no edit summary
Line 45: Line 45:  
*Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols;
 
*Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols;
 
*An operations and maintenance manual is to be provided that includes a maintenance schedule;
 
*An operations and maintenance manual is to be provided that includes a maintenance schedule;
===Quantity Control Section===
+
===Quantity control===
 
*Runoff coefficient or imperviousness calculations;
 
*Runoff coefficient or imperviousness calculations;
 
*Analysis using appropriate storm distributions;
 
*Analysis using appropriate storm distributions;
Line 59: Line 59:  
*Overland flow conveyance and design;
 
*Overland flow conveyance and design;
 
*External drainage conveyance (100 year and Regional);
 
*External drainage conveyance (100 year and Regional);
2.2. Quality Control Section
+
===Quality control===
Level of Protection.
+
*Level of Protection;
Drainage Area to Facility in hectares.
+
*Drainage Area to Facility in hectares;
Percentage Impervious – total and directly connected areas.
+
*Percentage Impervious – total and directly connected areas;
SWM Facility Monitoring and Maintenance Requirements.
+
*SWM Facility Monitoring and Maintenance Requirements;
3. Hazard Land Management
+
==Hazard land management==
Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings.
+
*Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings;
Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only).
+
*Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only);
Wetlands and required setbacks determined and identified on plans.
+
*Wetlands and required setbacks determined and identified on plans;
Meanderbelt assessment and/or setback determined and identified on plans.
+
*Meanderbelt assessment and/or setback determined and identified on plans;
Wave uprush and/or wind setup elevations calculated (Lake Simcoe Shoreline).
+
*Wave uprush and/or wind setup elevations calculated;
“Limit of development” shown on plans.
+
*“Limit of development” shown on plans;
Survey and floodplain mapping submitted (As per minimum requirement in Appendix K).
+
*Survey and floodplain mapping submitted (see below);
Hydraulic modelling and analysis including digital files (As per minimum requirements identified in Appendices C, I and K).
+
*Hydraulic modelling and analysis including digital files;
4. Other
+
==Other==
Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format.
+
*Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format;
 
----
 
----
 
===Floodplain mapping and documentation minimum requirements===
 
===Floodplain mapping and documentation minimum requirements===
8,255

edits

Navigation menu