Changes

Jump to navigation Jump to search
m
Line 252: Line 252:  
and staff than small-scale projects. Large-scale LID retrofits
 
and staff than small-scale projects. Large-scale LID retrofits
 
include:
 
include:
Bioretention
+
{{Div col|rules=yes|gap=2em|small=yes|colwidth=10em}}
Enhanced grass swales
+
* Bioretention
Bioswales
+
* Enhanced grass swales
Perforated pipe systems
+
* Bioswales
Permeable pavement
+
* Perforated pipe systems
Soakaways
+
* Permeable pavement
Infiltration chambers
+
* Soakaways
Rainwater harvesting (excluding rain barrels)
+
* Infiltration chambers
Prefabricated modules
+
* Rainwater harvesting (excluding rain barrels)
Green roofs
+
* Prefabricated modules
 +
* Green roofs
 +
{{Div col end}}
 +
 
 
Consider a large-scale project if your school board is striving
 
Consider a large-scale project if your school board is striving
 
to be a leader in sustainability. Large-scale projects are often
 
to be a leader in sustainability. Large-scale projects are often
Line 273: Line 276:  
following distinctions that set these retrofits apart from small-scale
 
following distinctions that set these retrofits apart from small-scale
 
projects.
 
projects.
 +
 
===Integration with long-term infrastructure replacement and rehabilitation plans===
 
===Integration with long-term infrastructure replacement and rehabilitation plans===
 
Most large-scale LID retrofits must function with existing
 
Most large-scale LID retrofits must function with existing
390

edits

Navigation menu