Changes

Jump to navigation Jump to search
Line 65: Line 65:  
|-
 
|-
 
|Infiltration trench||Two years||Clayey silt||155:1||2 m||16%
 
|Infiltration trench||Two years||Clayey silt||155:1||2 m||16%
 +
|-
 +
|Infiltration trench||Two years||Clay to clay silt till over silty sand till||Approx: 7:1||0.65 m||>90%
 +
|-
 +
|Infiltration trench||Two years||Silty sand with clayey silt deposits||Approx: 4:1||1 m||89%
 +
|-
 +
|Permeable pavement + bioretention||Four years||Clayey silt on silt till||Approx: 6:1||?||80%
 +
|-
 +
|Bioretention||Four years||Silty clay||Approx.: 10:1||?||92%
 +
|-
 +
|Bioretention||Four years||Silty clay fill over clay till||30:1||?||72%
 +
|-
 +
|Permeable pavement||Four years||Silty clay fill over clay till||1:1||?||?
 
|}
 
|}
 
+
|*Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
SWAMP, 2005 Infiltration trench Two years Clay to clay silt till over silty sand till Appox: 7:1 0.65 m >90%
  −
SWAMP, 2002 Infiltration trench Two years Silty sand with clayey silt deposits Approx: 4:1 1 m 89%
  −
CVC, 2016 Permeable pavement + bioretention Four years Clayey silt on silt till Approx: 6:1 ? 80%
  −
CVC, 2016 bioretention Four years Silty clay Approx.: 10:1 ? 92%
  −
CVC, 2016 bioretention Four years Silty clay fill over clay till 30:1 ? 72%
  −
CVC, 2016 Permeable pavement Four years Silty clay fill over clay till 1:1 ? ?
  −
1. Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
   
2. Also known as the Etobicoke Exfiltration system
 
2. Also known as the Etobicoke Exfiltration system
  
8,255

edits

Navigation menu