Changes

Jump to navigation Jump to search
no edit summary
Line 8: Line 8:  
*[[Bioswales]] (surface)
 
*[[Bioswales]] (surface)
 
}}
 
}}
 +
----
 
===Constraints===
 
===Constraints===
 
Infiltration practices are not recommended:
 
Infiltration practices are not recommended:
Line 25: Line 26:  
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
 
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
 
}}
 
}}
----
+
 
 
{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
 
{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
 
*[[Bioretention: Non-infiltrating | Stormwater planters]]
 
*[[Bioretention: Non-infiltrating | Stormwater planters]]
Line 31: Line 32:  
*[[Green roofs]]
 
*[[Green roofs]]
 
}}
 
}}
 +
----
 
===Planning===
 
===Planning===
 +
NEW CONTENT HERE?
 +
 
<h4>Soil infiltration rate</h4>
 
<h4>Soil infiltration rate</h4>
 
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
 
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
8,255

edits

Navigation menu