Changes

Jump to navigation Jump to search
Line 217: Line 217:     
'''Stormwater Management Criteria'''
 
'''Stormwater Management Criteria'''
Quantity Control – meet 100 year storm  
+
*Quantity Control – meet 100 year storm  
Quality Control – 80% TSS Removal;  
+
*Quality Control – 80% TSS Removal;  
Water Balance – on site retention of first 5 mm of rainfall  
+
*Water Balance – on site retention of first 5 mm of rainfall  
Stream erosion control, 25mm storm released over 72 hours, on-site retention of the first 5mm of rainfall  
+
*Stream erosion control, 25mm storm released over 72 hours, on-site retention of the first 5mm of rainfall  
    
'''Stormwater Management Strategy'''
 
'''Stormwater Management Strategy'''

Navigation menu