Line 15: Line 15:  
*Where flow comes off an impervious surface, a drop of 75 mm or more to the surface level of the diaphragm is recommended,
 
*Where flow comes off an impervious surface, a drop of 75 mm or more to the surface level of the diaphragm is recommended,
 
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,  
 
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,  
*The trench should be lined with before filling with gravel,   
+
*The trench should be lined with geotextile before filling with gravel,   
 
*River rock or decorative aggregate may be included in a layer at the top of the gravel fill, for aesthetic value.  
 
*River rock or decorative aggregate may be included in a layer at the top of the gravel fill, for aesthetic value.  
   −
===Materials===
+
===Materials===
 
<h4>Geotextile</h4>
 
<h4>Geotextile</h4>
 
{{:geotextiles}}
 
{{:geotextiles}}