Changes

Jump to navigation Jump to search
Line 12: Line 12:  
<ol>
 
<ol>
 
<li>Where the bedrock is within 1 m below the bottom of the proposed BMP.</li>
 
<li>Where the bedrock is within 1 m below the bottom of the proposed BMP.</li>
<li>Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP. Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property. </li>
+
<li>Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP. <br>Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property. </li>
 
<li>Over swelling clays or unstable sub-soils</li>
 
<li>Over swelling clays or unstable sub-soils</li>
 
<li>Over contaminated soils or sites with high risk of contamination from onsite activities </li>
 
<li>Over contaminated soils or sites with high risk of contamination from onsite activities </li>
8,255

edits

Navigation menu