All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Geotextiles: Installation (content was: "Geotextiles are filter fabrics that can be installed to separate dissimilar soils and prevent the migration of materials. Geotextiles are recommended for installation at the bottom and side limits of the LID feature and should be implemented at the discretion of the engineer. '''Construction Steps:''' #Roll out fabric on the flattened sub-grade surfac...", and the only contributor was "SamanthaPelayo" (talk))
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Underdrains: Installation (content was: "300px|thumb|right|Underdrain installed to subgrade. (Photo Source: CVC, 2010) 300px|thumb|right|Underdrain installed with maintenance risers. Note the 'T' joints, which are no longer recommended. (Photo Source: CVC, 2010) Underdrains are perforated pipes that collect subsurface water...", and the only contributor was "SamanthaPelayo" (talk))
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Overflow: Installation (content was: "Overflows are features of inline facilities and convey larger storm events out of the LID feature. '''Construction Steps:''' #Connect the overflow drain to the underdrain. #Fit a metal, domed grate to the overflow. #Install overflow pit to grade at the location specified in the contract documents. '''Key Inspection Points:''' *Overflow drain...", and the only contributor was "SamanthaPelayo" (talk))