Difference between revisions of "Bioretention: Partial infiltration"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
Line 19: Line 19:
 
{{Clickable button|[[Bioretention cells|Back to Bioretention]]}}
 
{{Clickable button|[[Bioretention cells|Back to Bioretention]]}}
  
[[category:Infiltration]]
+
[[category: Infiltration]]
[[category:Green infrastructure]]
+
[[category: GI]]

Revision as of 20:31, 3 November 2017

Partially infiltrating bioretention with underdrain.
Partially infiltrating bioretention with anaerobic/aerobic storage zone.

Overview[edit]

Over soils with slow infiltration rates, it is advantageous to drain a portion of the stored water prior to any upcoming storm. This popular design choice can optimize annual water balance, mitigate peak flow rates and by ensuring water flow through, can reduce the accumulation of sodium and chlorine ions from winter salting.

Performance[edit]

Bioretention: Water quality

Materials[edit]

Research[edit]

Bioretention: Partial infiltration volume

Back to Bioretention