− | === | + | ===Constraints=== |
+ | Infiltration practices are not recommended: | ||
<ol> | <ol> | ||
− | <li> | + | <li>Where the bedrock is within 1 m below the bottom of the proposed BMP.</li> |
− | <li> | + | <li>Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP. Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property. </li> |
− | <li> | + | <li>Over swelling clays or unstable sub-soils</li> |
− | <li> | + | <li>Over contaminated soils or sites with high risk of contamination from onsite activities </li> |
− | <li> | + | <li>In flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective. </li> |
− | <li> | + | <li>In areas where the ecology and natural hydrology are dependent upon surface water. </li> |
− | <li> | + | <li>Where prohibitions and/or restrictions exist per approved Source Protection Plans (see MOECC guidance). |
− | </ol> | + | </ol> |
+ | <p>Without infiltration, many LID design alternatives exist which can still capture and retain stormwater: | ||
+ | <ul> | ||
+ | <li>[[Partially infiltrating bioretention]]</li> | ||
+ | <li>[[Bioretention planters]]</li> | ||
+ | <li>[[Rainwater harvesting]]</li> | ||
+ | <li>[[Green roofs]]</li> | ||
+ | </ul> | ||
===Planning=== | ===Planning=== |
Revision as of 19:42, 4 July 2017
Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
Infiltration is promoted through a number of LID BMPs:
- Infiltration chambers and trenches (underground)
- Infiltration basins (surface)
- Bioretention cells (surface)
- Bioswales (surface)
Constraints[edit]
Infiltration practices are not recommended:
- Where the bedrock is within 1 m below the bottom of the proposed BMP.
- Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP. Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property.
- Over swelling clays or unstable sub-soils
- Over contaminated soils or sites with high risk of contamination from onsite activities
- In flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective.
- In areas where the ecology and natural hydrology are dependent upon surface water.
- Where prohibitions and/or restrictions exist per approved Source Protection Plans (see MOECC guidance).
Without infiltration, many LID design alternatives exist which can still capture and retain stormwater:
Planning[edit]
Soil Infiltration Testing
Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design.
Groundwater
The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year.
<clearFix></clearFix>
Catchment area | Consequence of failure | ||
---|---|---|---|
No damage or inconvenience | Minor damage or inconvenience to external structures (e.g. ponding in parking lot) | Significant damage to buildings or infrastructure (e.g. flooding damage) | |
<100 m2 | 1.5 | 2 | 10 |
100 - 1000 m2 | 1.5 | 3 | 10 |