This report by TRCA found several stormwater management benefits by incorporating several LID principles [[Bioretention]], [[Infiltration trenches]]/[[Infiltration chambers]], and [[Enhanced grass swales]] into sustainable functional design in an underutilized space, now named the 'Bentway' under Toronto's Gardiner Expressway. This allowed for dual functioning of a public recreational area and suitable stormwater management. Read more by clicking the button above
+
This report by TRCA found several stormwater management benefits by incorporating several LID principles [[Bioretention]], [[Infiltration trenches]]/[[Infiltration chambers]], and [[Enhanced grass swales]] into sustainable functional design in an underutilized space, now named the 'Bentway' under Toronto's Gardiner Expressway. This allowed for dual functioning of a public recreational area and suitable stormwater management. Read more by clicking the button above.
  
{{Clickable button|[[File:Elm drive.PNG|120 px|link=https://cvc.ca/wp-content/uploads/2018/01/Elm-Drive-Low-Impact-Development-Monitoring-Case-Study_Mar-22.pdf]]}}
+
{{Clickable button|[[File:Markham grenprint study.PNG|140 px|link=https://sustainabletechnologies.ca/app/uploads/2018/12/Markham-Green-Road-Case-Study_FINAL.pdf]]}}
 +
 
 +
This report by TRCA discusess the recent 'Markham Municipal Green Road Pilot Project' that was established between 2015 - 2018 and which is located on Vanni Avenue, south east of the intersection of 14th Avenue and Middlefield Rd. in a a mixed use residential and commercial property area. The specially designed road includes multiple low impact development (LID) technologies, including permeable paver boulevards, bioretention and infiltration trenches/galleries underlain beneath the bioretention features to manage stormwater at the source. To learn more about this "Green Street" read the project brief by clicking the button above.
 +
 
 +
Read more about *[[Bioretention here]].
 +
 
 +
{{Clickable button|[[File:Elm drive.PNG|100 px|link=https://cvc.ca/wp-content/uploads/2018/01/Elm-Drive-Low-Impact-Development-Monitoring-Case-Study_Mar-22.pdf]]}}
  
 
This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a [[Permeable pavement]] sidewalk and parking layby along with six [[Bioretention]] cells connected with an [[underdrain]]. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reductionm in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.
 
This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a [[Permeable pavement]] sidewalk and parking layby along with six [[Bioretention]] cells connected with an [[underdrain]]. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reductionm in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.
  
Read more about *[[Bioretention here]].
+
{{Clickable button|[[File:IMAX location.PNG|150 px|link=https://cvc.ca/wp-content/uploads/2018/01/IMAX-Low-Impact-Development-Monitoring-Case-Study_may-14-final-web.pdf]]}}
 +
 
 +
This report by CVC provides a thorough overview of the monitoring work done at the Imax corporate Headquarters, located in Mississauga, ON. The parking lot was expanded and retrofitted with a combination of traditional asphalt and permeable pavement. The asphalt runoff drains to one of three vegetated bioretention units on site. The The parking lot runoff is collected, absorbed and filtered by these LID practices before entering a wetland adjacent to the parking lot. Read more about these features performance over this multi-year study by clicking the button above.

Revision as of 18:16, 17 March 2022

Overview[edit]

This page is a repository of recent case studies that the Sustainable Technologies Evaluation Program (STEP) have conducted over the past two decades or so. Keep your eye on this page as new projects wrap up and technical briefs or reports are developed they will be added to this page.

Each of the documents are separated by the LID BMP feature that was studied / monitored or built, several of these documents will appear several times throughout this page as many have information on multiple LIDs' performance.

Bioretention[edit]

Bentway image.PNG

This report by TRCA found several stormwater management benefits by incorporating several LID principles Bioretention, Infiltration trenches/Infiltration chambers, and Enhanced grass swales into sustainable functional design in an underutilized space, now named the 'Bentway' under Toronto's Gardiner Expressway. This allowed for dual functioning of a public recreational area and suitable stormwater management. Read more by clicking the button above.

Markham grenprint study.PNG

This report by TRCA discusess the recent 'Markham Municipal Green Road Pilot Project' that was established between 2015 - 2018 and which is located on Vanni Avenue, south east of the intersection of 14th Avenue and Middlefield Rd. in a a mixed use residential and commercial property area. The specially designed road includes multiple low impact development (LID) technologies, including permeable paver boulevards, bioretention and infiltration trenches/galleries underlain beneath the bioretention features to manage stormwater at the source. To learn more about this "Green Street" read the project brief by clicking the button above.

Read more about *Bioretention here.

Elm drive.PNG

This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a Permeable pavement sidewalk and parking layby along with six Bioretention cells connected with an underdrain. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reductionm in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.

IMAX location.PNG

This report by CVC provides a thorough overview of the monitoring work done at the Imax corporate Headquarters, located in Mississauga, ON. The parking lot was expanded and retrofitted with a combination of traditional asphalt and permeable pavement. The asphalt runoff drains to one of three vegetated bioretention units on site. The The parking lot runoff is collected, absorbed and filtered by these LID practices before entering a wetland adjacent to the parking lot. Read more about these features performance over this multi-year study by clicking the button above.