*Before construction is shut down for the winter to ensure the site is ready for freezing conditions and thaws
*Before construction is shut down for the winter to ensure the site is ready for freezing conditions and thaws
−
*At the end of construction to confirm that the site has achieved at least 80% stabilization (CSA, 2018) and that permanent vegetation areas are well-established and effectively preventing erosion}}
+
*At the end of construction to confirm that the site has achieved at least 80% stabilization and that permanent vegetation areas are well-established and effectively preventing erosion}}