Changes

Jump to navigation Jump to search
Line 418: Line 418:  
Where applicable, inspections of ESC measures should be integrated with inspections of LID features. [[Inspections_and_maintenance#Inspection_.26_Maintenance_Terminology|Construction and assumption inspections]] for LID features are often required on the same schedule as ESC measures - for example, weekly, after major storm events, or at key construction milestones. You can download (downward facing arrow on the top righthand side) and print (printer emoticon on top right hand side) the inspection report template on the right.
 
Where applicable, inspections of ESC measures should be integrated with inspections of LID features. [[Inspections_and_maintenance#Inspection_.26_Maintenance_Terminology|Construction and assumption inspections]] for LID features are often required on the same schedule as ESC measures - for example, weekly, after major storm events, or at key construction milestones. You can download (downward facing arrow on the top righthand side) and print (printer emoticon on top right hand side) the inspection report template on the right.
   −
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]
+
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]][[File:ESC ponding 1.png|525px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]]
[[File:ESC ponding 1.png|525px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]]
      
==Performance Monitoring==
 
==Performance Monitoring==

Navigation menu