Changes

Jump to navigation Jump to search
Line 409: Line 409:  
*At the end of construction to confirm that the site has achieved at least 80% stabilization (CSA, 2018) and that permanent vegetation areas are well-established and effectively preventing erosion}}
 
*At the end of construction to confirm that the site has achieved at least 80% stabilization (CSA, 2018) and that permanent vegetation areas are well-established and effectively preventing erosion}}
   −
Where applicable, inspections of ESC measures should be integrated with inspections of LID features. Construction and assumption inspections (https://wiki.sustainabletechnologies.ca/wiki/Inspections_and_maintenance#Inspection_.26_Maintenance_Terminology) for LID features are often required on the same schedule as ESC measures - for example, weekly, after major storm events, or at key construction milestones.  
+
Where applicable, inspections of ESC measures should be integrated with inspections of LID features. [[Inspections_and_maintenance#Inspection_.26_Maintenance_Terminology|Construction and assumption inspections for LID features are often required on the same schedule as ESC measures - for example, weekly, after major storm events, or at key construction milestones.  
    
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]
 
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]

Navigation menu