Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Gravel diaphragms
(view source)
Revision as of 15:11, 19 October 2018
1 byte removed
,
6 years ago
m
→Design
Line 21:
Line 21:
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,
*The trench should be lined with geotextile before filling with gravel,
*The trench should be lined with geotextile before filling with gravel,
−
*River rock or decorative
aggregate
may be included in a layer at the top of the gravel fill, for aesthetic value.
+
*River rock or decorative
[[stone]]
may be included in a layer at the top of the gravel fill, for aesthetic value.
==Materials==
==Materials==
Jenny Hill
8,255
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version