Difference between revisions of "Check dams: Gallery"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
Line 4: Line 4:
 
Check dam Miss Rd.jpg|Concrete check dam with armourstone to protect against erosion. Concrete colour blends well with surroudning [[stone]]. This dam extends to the full depth of the [[swale]] and has 25 mm ø weep holes below grade.
 
Check dam Miss Rd.jpg|Concrete check dam with armourstone to protect against erosion. Concrete colour blends well with surroudning [[stone]]. This dam extends to the full depth of the [[swale]] and has 25 mm ø weep holes below grade.
 
Check dam - Mississauga Road.JPG|A check dam in action.  
 
Check dam - Mississauga Road.JPG|A check dam in action.  
Mississauga Rd.gif
+
Mississauga Rd.gif|This file is a gif, click to view
 
</gallery>
 
</gallery>
  

Revision as of 13:32, 28 September 2018

Also see Jen's Pinterest board of check dams