Changes

Jump to navigation Jump to search
m
Line 32: Line 32:     
===Outlet===
 
===Outlet===
 +
http://www.iowastormwater.org/documents/filelibrary/files/infiltration_bmps/Outlet_Structures_48B13497A39A1.pdf
 +
 
Detention time
 
Detention time
 
A detention time of 24 hours should be targeted in all instances. Where this necessaitates a very low outflow, a [[Flow control#Vortex valve|vortex valve]] or similar is recommended over an orifice or pipe restiction. The detention time is approximated by the drawdown time.
 
A detention time of 24 hours should be targeted in all instances. Where this necessaitates a very low outflow, a [[Flow control#Vortex valve|vortex valve]] or similar is recommended over an orifice or pipe restiction. The detention time is approximated by the drawdown time.
Line 69: Line 71:  
===Excess flow control===
 
===Excess flow control===
 
{{:flow through riser}}
 
{{:flow through riser}}
 +
https://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/
 
https://www.hydrologystudio.com/no-fail-detention-pond-design/
 
https://www.hydrologystudio.com/no-fail-detention-pond-design/
  
8,255

edits

Navigation menu