Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Bioretention: Construction checklist
(view source)
Revision as of 00:02, 5 September 2017
12 bytes added
,
7 years ago
no edit summary
Line 14:
Line 14:
|style="width:30px"|
|style="width:30px"|
|Gravel for the underdrain should be clean and washed; no fines should be present in the material
|Gravel for the underdrain should be clean and washed; no fines should be present in the material
+
|-
||
||
|Underdrain pipe material should be perforated and of the correct size (when specified in design)
|Underdrain pipe material should be perforated and of the correct size (when specified in design)
+
|-
||
||
|A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design)
|A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design)
+
|-
||
||
|Biomedia should be tested to confirm that it meets specifications
|Biomedia should be tested to confirm that it meets specifications
+
|-
||
||
|Mulch composition should be correct
|Mulch composition should be correct
Jenny Hill
8,255
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version