Changes

Jump to navigation Jump to search
Line 12: Line 12:  
===Step 1: Determine if your project falls Under CLI-ECA===
 
===Step 1: Determine if your project falls Under CLI-ECA===
 
Identify whether the proposed wastewater or stormwater project qualifies as a pre-authorized alteration under CLI-ECA. Common eligible projects include:
 
Identify whether the proposed wastewater or stormwater project qualifies as a pre-authorized alteration under CLI-ECA. Common eligible projects include:
 +
 
Stormwater:
 
Stormwater:
 
* Storm sewer upgrades or extensions
 
* Storm sewer upgrades or extensions
 
* Alterations to stormwater management facilities (e.g., [[wet ponds]], [[dry ponds]], [[wetlands]])
 
* Alterations to stormwater management facilities (e.g., [[wet ponds]], [[dry ponds]], [[wetlands]])
 
* Implementation or modification of LID practices (e.g., [[bioretention]], [[infiltration trenches]], [[permeable pavements]])
 
* Implementation or modification of LID practices (e.g., [[bioretention]], [[infiltration trenches]], [[permeable pavements]])
 +
 
Wastewater:
 
Wastewater:
 
*Sewage works used for the collection, storage, pumping, and transmission of sanitary sewage, excluding treatment
 
*Sewage works used for the collection, storage, pumping, and transmission of sanitary sewage, excluding treatment

Navigation menu