Changes

Jump to navigation Jump to search
Line 32: Line 32:  
[[LID Case Studies#Dry Ponds|Click here to read a case study on dry ponds at the The University of Toronto Scarborough campus.]]
 
[[LID Case Studies#Dry Ponds|Click here to read a case study on dry ponds at the The University of Toronto Scarborough campus.]]
   −
[[File:Screenshot 2025-08-25 144851.png|400px|thumb|left|link=https://sourcetostream.com/2024-track-1-day-1-denich-eves/|Click on the image to read about a centralized sub-surface storage infiltration facility with OGS pre-treatment located beneath an existing dry-pond in the Lake Simcoe Watershed]]
+
[[File:Screenshot 2025-08-25 144851.png|400px|thumb|left|link=https://sourcetostream.com/2024-track-1-day-1-denich-eves/|Click on the image to read about a infiltration facility with OGS pre-treatment located beneath an existing dry-pond in the Lake Simcoe Watershed.]]
<br clear="all" />
      
==Planning considerations==
 
==Planning considerations==

Navigation menu