*'''Applying [[Erosion and Sediment Control]] during construction''': Slowing runoff, trapping sediment, and protecting exposed soils reduces the amount of sediment released during construction. It is especially important to apply erosion and sediment controls during LID construction, since sediment build-up in infiltration-based LID BMPs can result in malfunction or failure (MECP, 2021)<ref>Ministry of the Environment, Conservation and Parks. 2022. Low Impact Development Stormwater | *'''Applying [[Erosion and Sediment Control]] during construction''': Slowing runoff, trapping sediment, and protecting exposed soils reduces the amount of sediment released during construction. It is especially important to apply erosion and sediment controls during LID construction, since sediment build-up in infiltration-based LID BMPs can result in malfunction or failure (MECP, 2021)<ref>Ministry of the Environment, Conservation and Parks. 2022. Low Impact Development Stormwater |