Changes

Jump to navigation Jump to search
Line 20: Line 20:  
*Apply [[pretreatment]] practices before infiltration of road or parking area runoff.
 
*Apply [[pretreatment]] practices before infiltration of road or parking area runoff.
   −
==Cold climate design considerations==
+
==Cold climate considerations==
 
[[File:Ice storm (1).jpg|thumb|Ice storm (1)]]
 
[[File:Ice storm (1).jpg|thumb|Ice storm (1)]]
 
===[[Underdrain |Underdrains]] and flow control devices===
 
===[[Underdrain |Underdrains]] and flow control devices===

Navigation menu