Line 81: Line 81:  
|Pre-treatment  
 
|Pre-treatment  
 
|style="text-align: left|
 
|style="text-align: left|
#Minimum depth: 1 m;
+
*Minimum depth: 1 m;
#Sized to ensure non-erosive velocities leaving forebay;  
+
*Sized to ensure non-erosive velocities leaving forebay;  
#Maximum area: 20 % of total permanent pool
+
*Maximum area: 20 % of total permanent pool
 
|-
 
|-
 
|Length-to-Width Ratio
 
|Length-to-Width Ratio
 
|Maximize flow path and minimize short-circuiting potential
 
|Maximize flow path and minimize short-circuiting potential
 
|style="text-align: left|
 
|style="text-align: left|
#Overall: minimum 3:1;   
+
*Overall: minimum 3:1;   
#Forebay: minimum 2:1
+
*Forebay: minimum 2:1
 
|-
 
|-
 
|Permanent pool depth
 
|Permanent pool depth
Line 102: Line 102:  
|Safety  
 
|Safety  
 
|style="text-align: left|
 
|style="text-align: left|
#5:1 For 3 m above and below permanent pool;  
+
*5:1 For 3 m above and below permanent pool;  
#Maximum 3:1 elsewhere
+
*Maximum 3:1 elsewhere
 
|-  
 
|-  
 
|Inlet  
 
|Inlet  
 
|Avoid clogging/freezing  
 
|Avoid clogging/freezing  
 
|style="text-align: left|
 
|style="text-align: left|
#Minimum 450 mm;  
+
*Minimum 450 mm;  
#Preferred pipe slope: >1%;  
+
*Preferred pipe slope: > 1 %;  
#If submerged, obvert 150 mm below expected maximum ice depth
+
*If submerged, obvert 150 mm below expected maximum ice depth
 
|-
 
|-
 
|Outlet (See also [[flow control]])
 
|Outlet (See also [[flow control]])
 
|Avoid clogging/freezing  
 
|Avoid clogging/freezing  
 
|style="text-align: left|
 
|style="text-align: left|
#Minimum: 450mm outlet pipe;  
+
*Minimum: 450 mm outlet pipe;  
#Preferred pipe slope: >1%;  
+
*Preferred pipe slope: > 1 %;  
#If orifice control used, 75mm diameter minimum;  
+
*If orifice control used, 75 mm diameter minimum;  
#Minimum 100mm orifice preferable  
+
8Minimum 100 mm orifice preferable  
 
|-
 
|-
 
|Maintenance access  
 
|Maintenance access  
 
|Access for backhoes or dredging equipment
 
|Access for backhoes or dredging equipment
 
|style="text-align: left|
 
|style="text-align: left|
#Provided to approval of Municipality;  
+
*Provided to approval of Municipality;  
#Provision of maintenance drawdown pipe preferred
+
*Provision of maintenance drawdown pipe preferred
 
|-
 
|-
 
|Buffer  
 
|Buffer  