Changes

Jump to navigation Jump to search
Line 10: Line 10:     
Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
 
Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
* Filter strip length of 5 metres.
+
* Filter strip length of 5 metres and width of 100 metres.
 
* Maximum acceptable impervious drainage area to pervious footprint area ratio of 4:1.
 
* Maximum acceptable impervious drainage area to pervious footprint area ratio of 4:1.
 
* Swale (0.3 m depth) and ditch inlet catch basin connected to storm sewer as outlet.
 
* Swale (0.3 m depth) and ditch inlet catch basin connected to storm sewer as outlet.
Line 29: Line 29:  
==Construction Costs==
 
==Construction Costs==
   −
[[File:Construction Breakdown VegStrip Full Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
+
[[File:Construction Breakdown VegStrip Full Infil 2023.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
      Line 44: Line 44:  
===25-Year life cycle cost break down===
 
===25-Year life cycle cost break down===
   −
[[File:25yr LCCT VegStrip Full Infil.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']]
+
[[File:25yr LCCT VegStrip Full Infil 2023.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
===50-Year life cycle cost break down===
 
===50-Year life cycle cost break down===
   −
[[File:50yr LCCT VegStrip Full Infil.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']]
+
[[File:50yr LCCT VegStrip Full Infil 2023.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
==Cost Summary Tables==
 
==Cost Summary Tables==
Line 58: Line 60:     
===Full Infiltration===
 
===Full Infiltration===
[[File:Filter bed grass pass.png|500px|thumb|Exampel of a mature filter strip beside a major highway, Washington State, U.S. (Photo Source: Washington State Department of Transportation, 2018)<ref>Washington State Department of Transportation. 2018. Vegetated Filter Strips: Low-impact development fact sheet. Authored by: Maria Cahill, Derek Godwin, and Jenna Tilt. Published June 2018. Accessed: 14 July 2022. https://catalog.extension.oregonstate.edu/em9208/html</ref>]]
+
[[File:Filter bed grass pass.png|600px|thumb|Exampel of a mature filter strip beside a major highway, Washington State, U.S. (Photo Source: Washington State Department of Transportation, 2018)<ref>Washington State Department of Transportation. 2018. Vegetated Filter Strips: Low-impact development fact sheet. Authored by: Maria Cahill, Derek Godwin, and Jenna Tilt. Published June 2018. Accessed: 14 July 2022. https://catalog.extension.oregonstate.edu/em9208/html</ref>]]
   −
[[File:Design Table VegStrip Full Infil.PNG|700px]]<br>
+
[[File:Design Table VegStrip Full Infil update 2023.PNG|800px]]<br>
 
</br>
 
</br>
    
==References==
 
==References==

Navigation menu