Changes

Jump to navigation Jump to search
no edit summary
Line 58: Line 58:     
===Underdrain===
 
===Underdrain===
[[File:PermeablePaving CS.png|frame|Permeable Pavement cross sections showing full and partial infiltration designs. Source: GVRD]]
+
[[File:PermeablePaving CrossSection.png|frame|Permeable Pavement cross sections showing full and partial infiltration designs. Source: GVRD]]
 
===Finish course===
 
===Finish course===
 
Consult the manufacturer for the design specifications of their product. In pervious concrete and porous asphalt systems, the concrete or asphalt mix specifications and construction procedures are key to proper functioning. These systems require well-trained and experienced contractors for installation.
 
Consult the manufacturer for the design specifications of their product. In pervious concrete and porous asphalt systems, the concrete or asphalt mix specifications and construction procedures are key to proper functioning. These systems require well-trained and experienced contractors for installation.
339

edits

Navigation menu