Changes

Jump to navigation Jump to search
no edit summary
Line 108: Line 108:  
The bottom of the reservoir should be level so that water infiltrates evenly.
 
The bottom of the reservoir should be level so that water infiltrates evenly.
   −
'''[[Permeable paving: Sizing]]'''
+
'''[[Permeable pavements: Sizing]]'''
    
===Geotextile===
 
===Geotextile===
Line 128: Line 128:  
File:Geogitter-4.jpg|Geogrids like these are sometimes incorporated into the layers of permeable pavement foundation aggregates to provide additional stability and conserve aggregate material.
 
File:Geogitter-4.jpg|Geogrids like these are sometimes incorporated into the layers of permeable pavement foundation aggregates to provide additional stability and conserve aggregate material.
 
</gallery>
 
</gallery>
===Modeling permeable paving in the Treatment Train Tool===
+
===Modelling permeable pavements in the Treatment Train Tool===
'''[[Permeable paving: TTT]]'''
+
'''[[Permeable pavements: TTT]]'''
    
==Construction Considerations==
 
==Construction Considerations==
Line 283: Line 283:  
*[https://permacon.ca/en/ Permacon]
 
*[https://permacon.ca/en/ Permacon]
 
==Gallery==
 
==Gallery==
{{:Permeable paving: Gallery}}
+
{{:Permeable pavements: Gallery}}
 
----
 
----
339

edits

Navigation menu