'''This page is an archive, please do not review, use or cite the contents below'''
 +
 
 +
{| class="wikitable"
 
|-  
 
|-  
!colspan="2" style="background:white; color:black"| LID Practice
+
!colspan="2"| LID Practice
!colspan="3" style="background: orange; color: black"|CANADA
+
!colspan="3"|CANADA
!colspan="5" style="background: brown; color: white"|United States  
+
!colspan="5"|United States  
 
|-
 
|-
!colspan="2" style="backgroung=green; color:white"|Soakaways, Infiltration Trenches and Chambers|| CVC+TRCA (Factsheets-2010)<ref> http://www.creditvalleyca.ca/wp-content/uploads/2012/02/lid-swm-guide-apdxa-soakaways-infiltration-trenches-chambers.pdf</ref>|| Toronto- 2016 || LID-SWM Guide 2010<ref> http://www.creditvalleyca.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf</ref>|| Massachusets SW BMP-2013 || District of Columbia-SWM Guidebook-2010 || W. Virginia-SWM design guidance manual-2012 || Pennsylvania-City of Philadelphia green St. design manual-2014 || Oregon SWM Manual-2014
+
!colspan="2"|Soakaways, Infiltration Trenches and Chambers|| CVC+TRCA (Factsheets-2010)<ref> http://www.creditvalleyca.ca/wp-content/uploads/2012/02/lid-swm-guide-apdxa-soakaways-infiltration-trenches-chambers.pdf</ref>|| Toronto- 2016 || LID-SWM Guide 2010<ref> http://www.creditvalleyca.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf</ref>|| Massachusets SW BMP-2013 || District of Columbia-SWM Guidebook-2010 || W. Virginia-SWM design guidance manual-2012 || Pennsylvania-City of Philadelphia green St. design manual-2014 || Oregon SWM Manual-2014
  
 
|-
 
|-
|colspan="2" |'''Setback from building Foundation(m)'''
+
|colspan="2" |Setback from Building Foundation (m)|| 4 ||  || 4 ||  ||  ||  ||    ||
| 4 ||  || 4 ||  ||  ||  ||    ||
 
 
|-
 
|-
|colspan="2"|'''(Impervious drainage/treatment) area'''
+
|colspan="2"|(Impervious Drainage/Treatment) Area||5:1-20:1, 10:1 recommended ||  || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|
|5:1-20:1, 10:1 recommended ||  || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|
 
 
|-
 
|-
|colspan="2"| '''Natural Slope (%)''' || < 15 ||  || < 15 ||  ||  ||  ||  ||  
+
|colspan="2"|Natural Slope (%)|| < 15 ||  || < 15 ||  ||  ||  ||  ||  
 
|-
 
|-
| colspan="2"|'''A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time'''  || 100-150 mm ||  || 100-150 mm ||  ||  ||  ||  ||  
+
| colspan="2"|A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm)'''  || 100-150 ||  || 100-150 ||  ||  ||  ||  ||  
 
 
 
|-
 
|-
| colspan="2"|'''Filter Mdia'''
+
| colspan="2"|[[Filter media]]
 
|-
 
|-
|colspan="2" style="text-align: right;|Stone Resvoir ||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate
+
|colspan="2" style="text-align: right;|[[Stone Resvoir]]||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate
 
|-
 
|-
|colspan="2" style="text-align: right;| Void space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||  
+
|colspan="2" style="text-align: right;| Void Space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||  
 
|-
 
|-
|colspan="2" style="text-align: right;| Granular material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||  
+
|colspan="2" style="text-align: right;| Granular Material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||  
 
|-
 
|-
|colspan="2" style="text-align: right;|Geotextile around the stone reservoirwith an overlap at the top   || min. 300 mm || 300 || min. 300 mm ||  ||  ||  ||  ||  
+
|colspan="2" style="text-align: right;|Geotextile around the stone reservoir with an overlap at the top (mm)|| min. 300 || 300 || min. 300 ||  ||  ||  ||  ||  
 
 
 
|-
 
|-
| colspan="2"| '''Bottom widh of excavations (mm)''' || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||  
+
|colspan="2"|Bottom Width of Excavations (mm)|| 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||  
 
|-
 
|-
| colspan="2"|'''Minimum depth of excavations under concrete laneway (mm)''' ||  ||  3000||  ||  ||  ||  || ||
+
|colspan="2"|Minimum Depth of Excavations under concrete laneway (mm)||  ||  3000||  ||  ||  ||  || ||
 
|-
 
|-
| colspan="2"| '''length of time for draining after storm event (>25mm)''' || max. 72 hr || || max.72 hr, 48 recommended || ||    ||   ||    ||
+
|colspan="2"|Length of Time for Draining after Storm Event (>25mm)||max. 72 hr.||   || max. 72 hr., 48 hr. recommended||   ||    ||     ||    ||
 
|-
 
|-
| colspan="2"| '''Depth to high water table (m)''' || 1 ||  || 1 ||  ||    ||  ||  ||  |     
+
|colspan="2"|Depth to High Water Table (m)|| 1 ||  || 1 ||  ||    ||  ||  ||  |     
 
|-
 
|-
| colspan="2"|'''Sand layer depth (mm)''' || |  ||150-300 ||  ||  ||  ||  ||  ||  |
+
|colspan="2"|Sand Layer Depth (mm)|| |  ||150-300 ||  ||  ||  ||  ||  ||  |Length of Time for Draining after Storm Event (>25mm)
 
|-
 
|-
| colspan="2"|'''Subdrains Inlet pipes (mm)''' ||  || 100-200 ||  ||  ||  ||  ||  ||  |
+
|colspan="2"|Subdrains Inlet Pipes (mm)||  || 100-200 ||  ||  ||  ||  ||  ||  |
 
|-
 
|-
| colspan="2"|'''Overflow ( if infiltration rate )''' ||  || < 15 mm/hr ||  ||  ||  ||  ||  ||  |  
+
|colspan="2"|Overflow is required when the infiltration rate equals||  || < 15 mm/hr ||  ||  ||  ||  ||  ||  |  
 
|-
 
|-
| colspan="2"|'''Facilties reciving road runoff are not located within time of travel wellhead protection areas, year''' || 2 ||  || 2 ||  ||  ||  ||  ||  |
+
|colspan="2"|Facilities receiving road runoff are not located within time of travel wellhead protection areas (years)|| 2 ||  || 2 ||  ||  ||  ||  ||  |
 
 
 
|}
 
|}

Latest revision as of 21:42, 18 March 2018

This page is an archive, please do not review, use or cite the contents below

LID Practice CANADA United States
Soakaways, Infiltration Trenches and Chambers CVC+TRCA (Factsheets-2010)[1] Toronto- 2016 LID-SWM Guide 2010[2] Massachusets SW BMP-2013 District of Columbia-SWM Guidebook-2010 W. Virginia-SWM design guidance manual-2012 Pennsylvania-City of Philadelphia green St. design manual-2014 Oregon SWM Manual-2014
Setback from Building Foundation (m) 4 4
(Impervious Drainage/Treatment) Area 5:1-20:1, 10:1 recommended 5:1-20:1, 10:1 recommended CDA < 5 acres CDA < 2 acres (T), < 5 acres (B) < 2 acres Max. load of 10:1 for infiltration systems (not specific to LID type)
Natural Slope (%) < 15 < 15
A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm) 100-150 100-150
Filter media
Stone Resvoir 1.5" to 3" stone dia., 2" pea gravel above 6" sand below 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below Stone 1.5"-3.5" Drain rock 3/4"-2.5 " washed open graded aggregate
Void Space(%) 30-40 30-40 30-40
Granular Material (clear stone)(mm) 50 50 50
Geotextile around the stone reservoir with an overlap at the top (mm) min. 300 300 min. 300
Bottom Width of Excavations (mm) 600-2400 600-2400 600-2400
Minimum Depth of Excavations under concrete laneway (mm) 3000
Length of Time for Draining after Storm Event (>25mm) max. 72 hr. max. 72 hr., 48 hr. recommended
Depth to High Water Table (m) 1 1
Sand Layer Depth (mm) 150-300 Length of Time for Draining after Storm Event (>25mm)
Subdrains Inlet Pipes (mm) 100-200
Overflow is required when the infiltration rate equals < 15 mm/hr
Facilities receiving road runoff are not located within time of travel wellhead protection areas (years) 2 2