Difference between revisions of "Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
Line 1: Line 1:
{| class="wikitable" style="width: 100%; height: 200px;"
+
{| class="wikitable"
 
|-  
 
|-  
!colspan="2" style="background:white; color:black"| LID Practice
+
!colspan="2"| LID Practice
!colspan="3" style="background: orange; color: black"|CANADA
+
!colspan="3"|CANADA
!colspan="5" style="background: brown; color: white"|United States  
+
!colspan="5"|United States  
 
|-
 
|-
!colspan="2" style="backgroung=green; color:white"|Soakaways, Infiltration Trenches and Chambers|| CVC+TRCA (Factsheets-2010)<ref> http://www.creditvalleyca.ca/wp-content/uploads/2012/02/lid-swm-guide-apdxa-soakaways-infiltration-trenches-chambers.pdf</ref>|| Toronto- 2016 || LID-SWM Guide 2010<ref> http://www.creditvalleyca.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf</ref>|| Massachusets SW BMP-2013 || District of Columbia-SWM Guidebook-2010 || W. Virginia-SWM design guidance manual-2012 || Pennsylvania-City of Philadelphia green St. design manual-2014 || Oregon SWM Manual-2014
+
!colspan="2"|Soakaways, Infiltration Trenches and Chambers|| CVC+TRCA (Factsheets-2010)<ref> http://www.creditvalleyca.ca/wp-content/uploads/2012/02/lid-swm-guide-apdxa-soakaways-infiltration-trenches-chambers.pdf</ref>|| Toronto- 2016 || LID-SWM Guide 2010<ref> http://www.creditvalleyca.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf</ref>|| Massachusets SW BMP-2013 || District of Columbia-SWM Guidebook-2010 || W. Virginia-SWM design guidance manual-2012 || Pennsylvania-City of Philadelphia green St. design manual-2014 || Oregon SWM Manual-2014
  
 
|-
 
|-
|colspan="2" |'''[[Setback from Building Foundation (m)]]'''
+
|colspan="2" |Setback from Building Foundation (m)|| 4 ||  || 4 ||  ||  ||  ||    ||
| 4 ||  || 4 ||  ||  ||  ||    ||
 
 
|-
 
|-
|colspan="2"|'''[[(Impervious Drainage/Treatment) Area]]'''
+
|colspan="2"|(Impervious Drainage/Treatment) Area||5:1-20:1, 10:1 recommended ||  || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|
|5:1-20:1, 10:1 recommended ||  || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|
 
 
|-
 
|-
|colspan="2"| '''[[Natural Slope (%)]]''' || < 15 ||  || < 15 ||  ||  ||  ||  ||  
+
|colspan="2"|Natural Slope (%)|| < 15 ||  || < 15 ||  ||  ||  ||  ||  
 
|-
 
|-
| colspan="2"|'''[[A capped vertical standpipe, perforated instaled to the bottom of the facility to monitor drainage time (mm)]]'''  || 100-150  ||  || 100-150  ||  ||  ||  ||  ||  
+
| colspan="2"|A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm)'''  || 100-150  ||  || 100-150  ||  ||  ||  ||  ||  
 
 
 
|-
 
|-
| colspan="2"|'''[[Filter Media]]'''
+
| colspan="2"|[[Filter media]]
 
|-
 
|-
|colspan="2" style="text-align: right;|Stone Resvoir ||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate
+
|colspan="2" style="text-align: right;|[[Stone Resvoir]]||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate
 
|-
 
|-
 
|colspan="2" style="text-align: right;| Void Space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||  
 
|colspan="2" style="text-align: right;| Void Space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||  
Line 27: Line 24:
 
|colspan="2" style="text-align: right;| Granular Material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||  
 
|colspan="2" style="text-align: right;| Granular Material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||  
 
|-
 
|-
|colspan="2" style="text-align: right;|Geotextile around the stone reservoir with an overlap at the top (mm) || min. 300  || 300 || min. 300  ||  ||  ||  ||  ||  
+
|colspan="2" style="text-align: right;|Geotextile around the stone reservoir with an overlap at the top (mm)|| min. 300  || 300 || min. 300  ||  ||  ||  ||  ||  
 
 
 
|-
 
|-
| colspan="2"| '''[[Bottom Width of Excavations (mm)]]''' || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||  
+
|colspan="2"|Bottom Width of Excavations (mm)|| 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||  
 
|-
 
|-
| colspan="2"|'''[[Minimum Depth of Excavations under concrete laneway (mm)]]''' ||  ||  3000||  ||  ||  ||  || ||
+
|colspan="2"|Minimum Depth of Excavations under concrete laneway (mm)||  ||  3000||  ||  ||  ||  || ||
 
|-
 
|-
| colspan="2" style=" color:brown"| '''Length of Time for Draining after Storm Event (>25mm)'''  ||max. 72 hr.||  || max. 72 hr., 48 hr. recommended||  ||    ||    ||    ||
+
|colspan="2"|Length of Time for Draining after Storm Event (>25mm)||max. 72 hr.||  || max. 72 hr., 48 hr. recommended||  ||    ||    ||    ||
 
|-
 
|-
| colspan="2"| '''[[Depth to High Water Table (m)]]''' || 1 ||  || 1 ||  ||    ||  ||  ||  |     
+
|colspan="2"|Depth to High Water Table (m)]]''' || 1 ||  || 1 ||  ||    ||  ||  ||  |     
 
|-
 
|-
| colspan="2"|'''[[Sand Layer Depth (mm)]]''' || |  ||150-300 ||  ||  ||  ||  ||  ||  |                       Length of Time for Draining after Storm Event (>25mm)
+
|colspan="2"|Sand Layer Depth (mm)|| |  ||150-300 ||  ||  ||  ||  ||  ||  |Length of Time for Draining after Storm Event (>25mm)
 
|-
 
|-
| colspan="2"|'''[[Subdrains Inlet Pipes (mm)]]''' ||  || 100-200 ||  ||  ||  ||  ||  ||  |
+
|colspan="2"|Subdrains Inlet Pipes (mm)||  || 100-200 ||  ||  ||  ||  ||  ||  |
 
|-
 
|-
| colspan="2"|'''[[Overflow is required when the infiltration rate equals]]''' ||  || < 15 mm/hr ||  ||  ||  ||  ||  ||  |  
+
|colspan="2"|Overflow is required when the infiltration rate equals||  || < 15 mm/hr ||  ||  ||  ||  ||  ||  |  
 
|-
 
|-
| colspan="2"|'''[[Facilities receiving road runoff are not located within time of travel wellhead protection areas (years)]]''' || 2 ||  || 2 ||  ||  ||  ||  ||  |
+
|colspan="2"|Facilities receiving road runoff are not located within time of travel wellhead protection areas (years)|| 2 ||  || 2 ||  ||  ||  ||  ||  |
 
 
 
|}
 
|}

Revision as of 03:08, 6 November 2017

LID Practice CANADA United States
Soakaways, Infiltration Trenches and Chambers CVC+TRCA (Factsheets-2010)[1] Toronto- 2016 LID-SWM Guide 2010[2] Massachusets SW BMP-2013 District of Columbia-SWM Guidebook-2010 W. Virginia-SWM design guidance manual-2012 Pennsylvania-City of Philadelphia green St. design manual-2014 Oregon SWM Manual-2014
Setback from Building Foundation (m) 4 4
(Impervious Drainage/Treatment) Area 5:1-20:1, 10:1 recommended 5:1-20:1, 10:1 recommended CDA < 5 acres CDA < 2 acres (T), < 5 acres (B) < 2 acres Max. load of 10:1 for infiltration systems (not specific to LID type)
Natural Slope (%) < 15 < 15
A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm) 100-150 100-150
Filter media
Stone Resvoir 1.5" to 3" stone dia., 2" pea gravel above 6" sand below 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below Stone 1.5"-3.5" Drain rock 3/4"-2.5 " washed open graded aggregate
Void Space(%) 30-40 30-40 30-40
Granular Material (clear stone)(mm) 50 50 50
Geotextile around the stone reservoir with an overlap at the top (mm) min. 300 300 min. 300
Bottom Width of Excavations (mm) 600-2400 600-2400 600-2400
Minimum Depth of Excavations under concrete laneway (mm) 3000
Length of Time for Draining after Storm Event (>25mm) max. 72 hr. max. 72 hr., 48 hr. recommended
Depth to High Water Table (m)]] 1 1
Sand Layer Depth (mm) 150-300 Length of Time for Draining after Storm Event (>25mm)
Subdrains Inlet Pipes (mm) 100-200
Overflow is required when the infiltration rate equals < 15 mm/hr
Facilities receiving road runoff are not located within time of travel wellhead protection areas (years) 2 2