Changes

Jump to navigation Jump to search
Line 28: Line 28:  
     <tr>
 
     <tr>
 
         <td>Engineered soil</td>
 
         <td>Engineered soil</td>
         <td>Biomedia required</td>
+
         <td>Filter media required</td>
 
         <td>Amendment preferable when possible</td>
 
         <td>Amendment preferable when possible</td>
 
     </tr>
 
     </tr>
Line 60: Line 60:  
     <strong>Additional components may include:</strong>
 
     <strong>Additional components may include:</strong>
 
     <ul>
 
     <ul>
         <li>[[Biomedia]] - an engineered soil mix</li>
+
         <li>[[Filter media]] - an engineered soil mix</li>
 
         <li>[[Underdrain]] with clean out and inspection ports</li>
 
         <li>[[Underdrain]] with clean out and inspection ports</li>
 
         <li>[[Liner|Impermeable membrane]] to prevent infiltration to soils below</li>
 
         <li>[[Liner|Impermeable membrane]] to prevent infiltration to soils below</li>
 
         <li>[[Turf reinforcement]] to prevent scour</li>
 
         <li>[[Turf reinforcement]] to prevent scour</li>
         <li>Check dams</li>
+
         <li>[[Check dams]] to facilitate short tern ponding</li>
 
     </ul>
 
     </ul>
 
</p>
 
</p>
8,255

edits

Navigation menu