Changes

Jump to navigation Jump to search
277 bytes added ,  6 years ago
Line 50: Line 50:     
===Planning Considerations===
 
===Planning Considerations===
 +
<div class="col-md-8">
 
<ul>
 
<ul>
 
<li>Although linear design (surface area typically >2:1 length:width) is a feature of a swale, an absolute minimum width is 0.6 m is required for bioswales to have healthy plant growth, and to facilitate construction. </li>
 
<li>Although linear design (surface area typically >2:1 length:width) is a feature of a swale, an absolute minimum width is 0.6 m is required for bioswales to have healthy plant growth, and to facilitate construction. </li>
Line 58: Line 59:  
<li>Slopes > 6% can accommodate a series of stepped [[bioretention cells]], each overflowing with a weir, into the next.  </li>
 
<li>Slopes > 6% can accommodate a series of stepped [[bioretention cells]], each overflowing with a weir, into the next.  </li>
 
</ul>
 
</ul>
 +
<div class="col-md-4">
 +
<gallery mode="packed" widths=300px heights=300px>
 +
Bioswale.png| Bioswale with check dams, vertical scale exaggerated.
 +
Stepped cells.png| The stepped cells alternative for slopes > 6 %. 
 +
</gallery>
 +
</div>
 +
<div class="col-md-12">
    
----
 
----
8,255

edits

Navigation menu