Search results

Jump to navigation Jump to search
  • ...trash and debris twice a year, and weeding every five years. Verification inspections are included every 5 years to confirm adequate maintenance.
    7 KB (1,035 words) - 21:48, 17 January 2023
  • ...nually, and removal of weeds twice a year (where applicable). Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    8 KB (1,101 words) - 15:11, 1 June 2023
  • ...nd removal of sediment from pretreatment structures annually. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    8 KB (1,041 words) - 16:12, 6 March 2023
  • ...tion protocols and the pace and extent of construction may preclude proper inspections and certifications. Regular inspections throughout the construction process of LID practices prevent end products t
    11 KB (1,459 words) - 21:51, 23 November 2022
  • ...tlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    7 KB (1,008 words) - 21:26, 17 January 2023
  • *[[Inspections and maintenance]] responsibilities during construction and prior to assumpt *material specifications, inspections, and chain-of-custody
    19 KB (2,704 words) - 19:13, 27 March 2023
  • ...r, removal of sediment from pretreatment structures annually. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    9 KB (1,205 words) - 20:50, 17 January 2023
  • ...nually, and removal of weeds twice a year (where applicable). Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    9 KB (1,271 words) - 17:17, 16 January 2023
  • ...trash and debris twice a year, and vacuum sweeping annually. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    9 KB (1,317 words) - 16:22, 17 January 2023
  • ...trash and debris twice a year, and vacuum sweeping annually. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 ye
    10 KB (1,451 words) - 17:15, 17 January 2023
  • Construction inspections take place during several points in the construction sequence, specific to Additional inspections may be needed depending on the number of layers in the green roof design (e
    13 KB (1,912 words) - 22:24, 28 September 2022
  • ...ance Verification inspections only (i.e., not for Maintenance Verification inspections) </span></u> Construction inspections take place during several points in the construction sequence, specific to
    31 KB (4,425 words) - 21:09, 29 September 2022
  • Inspections will need to occur within 24 hours of significant rain events (>25 mm) to e During inspections or as needed to ensure performance
    13 KB (1,821 words) - 19:55, 4 October 2022
  • ...ons of traffic control and utility conflicts must be part of the plans and inspections.
    6 KB (835 words) - 14:30, 7 October 2022
  • ...ance Verification inspections only (i.e., not for Maintenance Verification inspections) </span></u> ...yethylene cistern being installed during construction. During construction inspections it's important to note whether or not the depths, slopes and elevations are
    31 KB (4,474 words) - 20:40, 3 October 2022
  • ...ance Verification inspections only (i.e., not for Maintenance Verification inspections) </span></u> [[File:Grass strip planting plan.JPG|485px|thumb|During construction inspections the planting material (types and quantities) selected along with where they
    32 KB (4,600 words) - 20:59, 29 September 2022
  • ...quired drainage time (typically 72 hours). Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and eve
    7 KB (1,013 words) - 19:51, 20 February 2024
  • ...ace during construction activity and would be reviewed during construction inspections to ensure its operating efficiently and excess sediment is removed routinel ...ance Verification inspections only (i.e., not for Maintenance Verification inspections) </span></u>
    38 KB (5,498 words) - 15:25, 4 August 2023
  • ...ance Verification inspections only (i.e., not for Maintenance Verification inspections) </span></u> Construction inspections take place during several points in the construction sequence, specific to
    37 KB (5,353 words) - 18:37, 4 October 2022
  • ...ance Verification inspections only (i.e., not for Maintenance Verification inspections) </span></u> Construction inspections take place during several points in the construction sequence, specific to
    40 KB (5,747 words) - 15:11, 4 August 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)