Changes

Jump to navigation Jump to search
Line 2: Line 2:  
It is critical that your project team understands site conditions for road right of ways (ROW) as part of the larger process of [[Screening LID Options]]. The choice of the ROW LID approach will depend on various site conditions that include road type, the type of construction project, and then various physical, social, and economic constraints.  
 
It is critical that your project team understands site conditions for road right of ways (ROW) as part of the larger process of [[Screening LID Options]]. The choice of the ROW LID approach will depend on various site conditions that include road type, the type of construction project, and then various physical, social, and economic constraints.  
   −
== Desktop Analysis of Background Documents ==
+
=== Desktop Analysis of Background Documents ===
    
An initial desktop assessment of the site which includes various background studies, reports, and existing site plans will help have a larger understanding of the site, expected conditions, and what will need to be verified. Background information that could help determine project targets and scope technical investigations could include:
 
An initial desktop assessment of the site which includes various background studies, reports, and existing site plans will help have a larger understanding of the site, expected conditions, and what will need to be verified. Background information that could help determine project targets and scope technical investigations could include:
147

edits

Navigation menu