Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
Runoff Volume Control Target (RVC<sub>T</sub>)  
 
Runoff Volume Control Target (RVC<sub>T</sub>)  
 
<br>
 
<br>
Page to include image of the 90th percentile and links to MOECC manual
+
{{TextBox|1="The means to achieve the RVC<sub>T</sub> includes:<br>
 +
a) <strong>Retention</strong> - where the captured volume shall be ultimately infiltrated, evapotranspired or re-used and the specified volume will not later be discharged to sewer networks (with the exception of internal water re-use activities) or surface waters and does not therefore become runoff,
 +
and<br>
 +
b) <strong>Volume Capture and Treatment</strong> - Also referred to as `treatment and release`, where the volume capture and treatment directly aims at reducing surface water impairment through treatment of the specified volume, often referred to as a “water quality volume”.<ref>MOECC (2018)</ref>}}
 +
 
 +
<references/>
 +
 
 +
Page to include image of the 90th percentile
8,255

edits

Navigation menu