Changes

Jump to navigation Jump to search
Line 5: Line 5:  
<math>Y_{0.05} = A \times C_{vol, A}\times R_{a} \times e \times 0.05</math>
 
<math>Y_{0.05} = A \times C_{vol, A}\times R_{a} \times e \times 0.05</math>
 
where:
 
where:
Y<sub>0.05</sub> &#61;  Five percent of the average annual yield (L)
+
{{plainlist|
A &#61;  The catchment area (m<sup>2</sup>)
+
*Y<sub>0.05</sub> &#61;  Five percent of the average annual yield (L)
C<sub>vol, A</sub> &#61;  The annual runoff coefficient for the catchment
+
*A &#61;  The catchment area (m<sup>2</sup>)
R<sub>a</sub> &#61;  The average annual rainfall depth (mm)
+
*C<sub>vol, A</sub> &#61;  The annual runoff coefficient for the catchment
e &#61; The efficiency of the pre-storage filter
+
*R<sub>a</sub> &#61;  The average annual rainfall depth (mm)
 +
*e &#61; The efficiency of the pre-storage filter}}
     
8,255

edits

Navigation menu