==Design Assumptions==
 
==Design Assumptions==
[[Rainwater harvesting|Rainwater harvesting (RWH)]] is ideal for sites that cannot infiltrate water (e.g. contaminated soils, WHPAs, IPZs, etc.), zero-lot-line developments, large gardens and landscaped areas. Components include: catchment area (e.g. rooftop), pretreatment filter to remove coarse debris, cistern storage, and a connecting pipe network. Additional components include pumps to lift water to higher elevations, additional water filtration and treatment. <br>
+
[[Rainwater harvesting|Rainwater harvesting (RWH)]] is ideal for high density, zero-lot-line developments, large garden and landscape areas, and sites that cannot infiltrate water (e.g. contaminated soils, WHPAs, IPZs, etc.). Components include: catchment area (e.g. rooftop), pretreatment filter to remove coarse debris, cistern storage, and a connecting pipe network. Additional components include pumps to lift water to higher elevations, additional water filtration and treatment. <br>
    
Design and operation and maintenance program assumptions used to generate the cost estimate are based on tool default values and the following STEP recommendations:
 
Design and operation and maintenance program assumptions used to generate the cost estimate are based on tool default values and the following STEP recommendations:
Line 27: Line 27:  
==Construction Costs==
 
==Construction Costs==
   −
[[File:Construction Breakdown RWH No Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']]
+
[[File:Construction Breakdown RWH No Infil 2023.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']]
 
      
<small>'''Note:''' Please click on each image to enlarge to view associated construction cost estimates.</small><br>
 
<small>'''Note:''' Please click on each image to enlarge to view associated construction cost estimates.</small><br>
      −
Above you can find a breakdown of construction costs by expense type for the 50,000 L below-ground cistern design configuration.  
+
Above you can find a breakdown of construction costs by expense type for the 50,000 L below-ground concrete cistern design configuration.  
    
The Material & Installation expenses represent the largest portion of total construction costs (86%).
 
The Material & Installation expenses represent the largest portion of total construction costs (86%).
    
==Life Cycle Costs==
 
==Life Cycle Costs==
Below are capital and life cycle cost estimates for the below-ground concrete cistern design configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 19% of total life cycle costs over the 25-year evaluation period, and increase to 27% of total life cycle costs over the 50-year period, due to periodic cleaning of cistern tank and replacing components (pump and pressure tank).
+
Below are capital and life cycle cost estimates for the below-ground concrete cistern design configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 19% of total life cycle costs over the 25-year evaluation period, and increase to 27% of total life cycle costs over the 50-year period, due to periodic cleaning of cistern tank and replacing of components (pump and pressure tank).
    
===25-Year life cycle cost break down===
 
===25-Year life cycle cost break down===
   −
[[File:25yr LCCT RWH No Infil.PNG|thumb|center|900px|'''Rainwater Harvesting: No Infiltration''']]
+
[[File:25yr LCCT RWH No Infil 2023.PNG|thumb|center|900px|'''Rainwater Harvesting: No Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
===50-Year life cycle cost break down===
 
===50-Year life cycle cost break down===
   −
[[File:50yr LCCT RWH No Infil.PNG|thumb|center|900px|'''Rainwater Harvesting: No Infiltration''']]
+
[[File:50yr LCCT RWH No Infil 2023.PNG|thumb|center|900px|'''Rainwater Harvesting: No Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
Line 55: Line 55:  
Total life cycle cost estimate over the 50 year evaluation period for the below-ground concrete cistern design configuration is ($124,016.80), making it one of the cheapest LID BMP options.<br>
 
Total life cycle cost estimate over the 50 year evaluation period for the below-ground concrete cistern design configuration is ($124,016.80), making it one of the cheapest LID BMP options.<br>
   −
===Full Infiltration===
+
===No Infiltration===
[[File:RWH rain barrel.PNG|500px|thumb|A residential [[rain barrels|rain barrel]] collecting roofwater from the house installed with a diverter to ensure water does not overflow the system when full and allows water to instead bypass the barrel and enter directly into the storm sewer through a storm lateral or enter an on site [[dry swale]] or [[infiltration trench]], if installed.]]
+
[[File:RWH rain barrel.PNG|700px|thumb|A residential [[rain barrels|rain barrel]] collecting roofwater from the house installed with a diverter to ensure water does not overflow the system when full and allows water to instead bypass the barrel and enter directly into the storm sewer through a storm lateral or enter an on site [[dry swale]] or [[infiltration trench]], if installed.]]
   −
[[File:Design Table RWH No Infil.PNG|700px]]<br>
+
[[File:Design Table RWH No Infil 2023.PNG|900px]]<br>
 
</br>
 
</br>

Navigation menu